The rate of construction in Oaks, PA has increased in the first week of February.
Earth moving at the Chicago Grill / Pizzeria Uno site.
As well as at the eastbound exit of US 422.
There is quite a bit of activity near the western end of the Oaks Shopping Center site, at the intersection with Mill Road.
A grader and bulldozer with GPS units at each end of its blade are digging down below the street level.
Lots of earth is being moved. More than a half dozen pieces of equipment are doing the moving.
More drainage pipes have been buried under gravel.
The weather has been cooperative.
No storms or high winds.
Before you know it you will be able to smell the Wawa coffee at Egypt and Black Rock Roads.
©Damyon T. Verbo - all rights reserved
Do you know if they will be adding traffic lanes around the intersection of Egypt and Blackrock roads / 422 interchange?
ReplyDeleteI believe they are in the midst of doing just that.
Delete