Sunday, June 9, 2013

Walls Going Up in Oaks

Walls are going up in Oaks, PA at the intersection of Egypt and Black Rock Roads.


Block laying started here between Black Rock Road and US 422. 




This retaining wall was first to be built. It runs parallel with both US 422 and Egypt Road.



This bricklaying scaffold is in place, inside the walls of the future restaurant. The building is taking shape.


Rebar is set with safety caps atop to keep the workers from loosing an eye or being impaled in a fall.


Some blocks begin to frame a door way, others stacked waiting for the call.


Others lay broken, half used, cast off. Sacrificed to the greater whole.

Whole pizzas can't be far behind.

©Damyon T. Verbo - all rights reserved





No comments:

Post a Comment

Don't be shy. Leave a comment. I won't bite your head off.