Oaks Shopping Center Construction
The above drainage slough was modified with a storm water pipe just past the middle of the plot. The pipe was then covered with dirt so vehicles and heavy equipment could get over it.
If I am reading the plans correctly, pipe will be placed throughout the slough, covered and paved over. This will be the main exit from the shopping center. The only exit governed by a traffic signal.
Below the land sculpting continues.
My try at art.
No comments:
Post a Comment
Don't be shy. Leave a comment. I won't bite your head off.