Pages

Tuesday, March 5, 2013

Mid-day First Monday in March

Oaks Shopping Center Construction

The weather has been cold and wet since my last post about the construction. There were a few days when there wasn't any activity because of the weather.

The above drainage slough was modified with a storm water pipe just past the middle of the plot. The pipe was then covered with dirt so vehicles and heavy equipment could get over it.


If I am reading the plans correctly, pipe will be placed throughout the slough, covered and paved over. This will be the main exit from the shopping center. The only exit governed by a traffic signal.


Below the land sculpting continues.






My try at art.

©Damyon T. Verbo - all rights reserved







No comments:

Post a Comment

Don't be shy. Leave a comment. I won't bite your head off.