Saturday, March 23, 2013

2013 First Day of Spring Oaks Construction

I was fairly active with my camera on the first day of spring. Here are the construction sites at the intersections of Egypt and Black Rock Roads. Including the building sites and some road reconstruction at the US 422 exit for traffic driving east.

Bank site
Chicago Grill site
Wawa site and beyond
Landscaping near intersection


Eastbound exit US 422 at Oaks

Two utility poles were planted at the eastbound entrance to US 422 to support the weight of the power lines going around the Oaks Shopping Center site.


©Damyon T. Verbo - all rights reserved




No comments:

Post a Comment

Don't be shy. Leave a comment. I won't bite your head off.