Demolition continues for the widening of Egypt Road.
Tomato Cages
Showing posts with label Station Ave. Show all posts
Showing posts with label Station Ave. Show all posts
Wednesday, August 28, 2013
1509 Egypt Road Demolished in Oaks, PA
Labels:
1509,
19456,
2013,
August,
demolition,
Egypt Road,
Mill Road,
Oaks,
PA,
razed,
Reading Site Contractors,
road widening,
Station Ave
Sunday, August 18, 2013
Demolition to Widen Egypt Rd.
Work has already started between between Cresson Blvd. and Oaks Deli and Pizzeria.
The house there is unoccupied and the driveway and front lawn was dug up for utility work.

From the alignment of the utility poles, the patio outside Oaks Deli and Pizzeria just might be reduced in size by the road widening.
Two buildings west of Mill Rd. have been stripped of all their asbestos shingles.


The building with the cupola at the intersection of Egypt Rd. and Station Ave. that is extremely close to the road was prepared for demolition.
As is the adjacent brick building to the west on Egypt Rd.


The semi-detached houses seem to be the last on Egypt Rd. scheduled for demolition.
©Damyon T. Verbo - all rights reserved
Labels:
19456,
construction,
Cresson Blvd,
demolition,
development,
Egypt Road,
houses,
Mill Road,
Montgomery County,
Oaks,
Oaks Pizzeria,
PA,
Reading Site Contractors,
small,
Station Ave,
town,
Upper Providence,
US 422
Subscribe to:
Posts (Atom)

















